Educational & Institutional
Wilmot Union High School - Wilmot, WI
- Building Area = 312,000 S.F.
- Construction Cost = $39.0 million
- Phase 1 - Gym, Auditorium, Cafeteria, etc.
- Phase 2 - 2-story building constructed over the demolished footprint
- Construction - steel joists and masonry bearing walls
Burlington High School - Burlington, WI
- Building Area = 266,500 S.F.
- Construction Cost = $32.9 million
- Four-station field house
- 460-seat auditorium
Fond Du Lac High School - Fond Du Lac, WI
- Building Area = 390,000 S.F.
- Construction Cost = $48.8 million
- Two-story academic wing with steel frame & composite floor system
- Single story areas with precast concrete panels or masonry bearing walls
- Roof framing consists of steel joists and deck
Homestead High School Additions - Mequon, WI
- Building Area of Additions = 191,000 S.F.
- Construction Cost = $24.0 million
- Several additions completed over several years
Door County Justice Center - Sturgeon Bay, WI
- Building Area (including 2007 addition) = 137,128 S.F.
- Construction Cost (including 2007 addition) = $16.5 million
- Detention Center - Precast concrete roof & floors
- Courthouse floor framing - Composite steel beam and deck
- Courthouse roof framing - steel joist and deck
Brotz Family Science Building - UW Sheboygan, WI
- Building Area = 18,125 S.F.
- Construction Cost = $4.5 million
- Structural steel frame
- Precast concrete floor
- Steel joist & deck roof