Educational & Institutional
Sun Prairie High School – Sun Prairie, WI
- Building Area = 409,000 S.F.
- Construction Cost = $80.0 million
- Olympic Style Pool, full Fieldhouse, Auditorium with full stage loft and a balcony with a 100 foot girder span
- 3 stories of classrooms supported by a chevron braced steel frame system with composite floor construction
- Exterior envelope constructed with Precast panels and a masonry cavity wall system.
Indian Trail Academy- Kenosha, WI
- Building Addition = 249,000 S.F.
- Building Remodeling = 94,000 S.F.
- Construction Cost = $41.4 million
- 2 stories of classrooms supported by a precast panel and masonry bearing wall system
Wilmot Union High School – Wilmot, WI
- Building Area = 312,000 S.F.
- Construction Cost = $39.0 million
- Phase 1 – Gym, Auditorium, Cafeteria, etc.
- Phase 2 – 2-story building constructed over the demolished footprint
- Construction – steel joists and masonry bearing walls
Burlington High School – Burlington, WI
- Building Area = 266,500 S.F.
- Construction Cost = $32.9 million
- Four-station field house
- 460-seat auditorium
Fond Du Lac High School – Fond Du Lac, WI
- Building Area = 390,000 S.F.
- Construction Cost = $48.8 million
- Two-story academic wing with steel frame & composite floor system
- Single story areas with precast concrete panels or masonry bearing walls
- Roof framing consists of steel joists and deck
Door County Justice Center – Sturgeon Bay, WI
- Building Area (including 2007 addition) = 137,128 S.F.
- Construction Cost (including 2007 addition) = $16.5 million
- Detention Center – Precast concrete roof & floors
- Courthouse floor framing – Composite steel beam and deck
- Courthouse roof framing – steel joist and deck