Educational & Institutional

Sun Prairie High SchoolSun Prairie High School – Sun Prairie, WI

  • Building Area = 409,000 S.F.
  • Construction Cost = $80.0 million
  • Olympic Style Pool, full Fieldhouse, Auditorium with full stage loft and a balcony with a 100 foot girder span
  • 3 stories of classrooms supported by a chevron braced steel frame system with composite floor construction
  • Exterior envelope constructed with Precast panels and a masonry cavity wall system.

Indian Trail Academy- Kenosha, WI

  • Building Addition = 249,000 S.F.
  • Building Remodeling = 94,000 S.F.
  • Construction Cost = $41.4 million
  • 2 stories of classrooms supported by a precast panel and masonry bearing wall system

Wilmot Union High School – Wilmot, WI

  • Building Area = 312,000 S.F.
  • Construction Cost = $39.0 million
  • Phase 1 – Gym, Auditorium, Cafeteria, etc.
  • Phase 2 – 2-story building constructed over the demolished footprint
  • Construction – steel joists and masonry bearing walls

Burlington High School – Burlington, WI

  • Building Area = 266,500 S.F.
  • Construction Cost = $32.9 million
  • Four-station field house
  • 460-seat auditorium

Fond Du Lac High School – Fond Du Lac, WI

  • Building Area = 390,000 S.F.
  • Construction Cost = $48.8 million
  • Two-story academic wing with steel frame & composite floor system
  • Single story areas with precast concrete panels or masonry bearing walls
  • Roof framing consists of steel joists and deck

Door County Justice Center – Sturgeon Bay, WI

  • Building Area (including 2007 addition) = 137,128 S.F.
  • Construction Cost (including 2007 addition) = $16.5 million
  • Detention Center – Precast concrete roof & floors
  • Courthouse floor framing – Composite steel beam and deck
  • Courthouse roof framing – steel joist and deck